← All projects
05 —
Rooms · Bathroom
Replacing a dated bathroom with a level-access shower room that is easy to live with and to clean.
Location
Hackney, London
Year
2024
Duration
5 weeks
01 — The starting point
What the owners
wanted to change
An old bathroom with a bath nobody used, tired tiles and ventilation that let moisture settle.
02 — What we checked first
Floor build-up for a level shower, waterproofing, drainage falls and ventilation.
Trades involved
Plumbing
Waterproofing
Tiling
Electrics
Ventilation
Before, after,
same viewpoint
Photographed from the same spot, so you can judge the work rather than the camera angle.
FIG. 01 — Before / after
Drag to compare
03 — How we approached it
Three moves,
in this order
Each decision was explained and agreed before the work moved on.
04 — The result
Finish by finish

FIG. 02 — Main room

FIG. 03 — Detail

FIG. 04 — Junction

FIG. 05 — Material

FIG. 06 — Overview