← All projects
03 —
Finishes
Floors, paint, joinery and fittings chosen as one, so a home stops looking renovated in pieces.
Location
Islington, London
Year
2024
Duration
8 weeks
01 — The starting point
What the owners
wanted to change
A home renovated room by room over the years. Each space worked, but nothing matched and every transition showed.
02 — What we checked first
The substrates under existing finishes, floor levels between rooms, and which joinery was worth keeping.
Trades involved
Plastering
Painting
Flooring
Joinery
Before, after,
same viewpoint
Photographed from the same spot, so you can judge the work rather than the camera angle.
FIG. 01 — Before / after
Drag to compare
03 — How we approached it
Three moves,
in this order
Each decision was explained and agreed before the work moved on.
04 — The result
Finish by finish

FIG. 02 — Main room

FIG. 03 — Detail

FIG. 04 — Junction

FIG. 05 — Material

FIG. 06 — Overview